Switch to English?
Yes
Переключитись на українську?
Так
Переключиться на русскую?
Да
Przełączyć się na polską?
Tak

Freeelancers' best works

1000+
  • Diving with sharks and crocodiles

    Copywriting
    Description of popular attractions


  • Divine Design Interior Design in Kiev

    Website development
    The site is designed on WordPress to make it easy to fill the content by the customer.
    I had a job:
    Creation of the site
    Optimization of the core
    Progress in searches
    The site is fully supported on the MOB. The devices.
    The Site Visit


  • 4 USD

    Division of the property of the spouses (legal article)

    Article writing
    Legal article for the website of the jury about the division of the common property of the spouses during marriage.
    Number of symbols 2800
    The price is 140g
    The price is 50gn 1000 signs (for legal subjects).
    The assessment of this work cannot be unique, as the rules of law are used in writing. Therefore, this work should be assessed from the point of view of its legal correctness, as well as the understanding for a person with or without a legal education.
    #copy #writing #article #legal #writing #consultation #content #jurist


  • Divingline

    HTML and CSS
    The Landing Page


  • 51 USD

    Dividend policy of the shareholders' partnership

    The Master Robot


  • 214 USD

    Division of KMD. Places for the installation of "CYCLON"

    Drawings and diagrams
    Dmitry Dmitry Anatolyovich
    Engineer of Constructor.
    Execution of the project sections:
    The construction of metal (KM)
    Construction of metal particles (CMD)
    Architectural solutions (AR)
    Construction of Iron Beton (KJ)
    Visualization and animation of architecture;
    -Digitalization and installation of schemes and scratches.


    #5ENGINEERS #CMD #CM #Production #Construction #Development_Design #Production #Top #Freelancehunt #Freelancer
    #visualisation #visualization #Rendering #3d-visualization #metalloconstructions
    The Crossing


  • 9 USD

    Division of KMD. The height is 5.5 meters.

    Designing
    Dmitry Dmitry Anatolyovich
    Engineer of Constructor.
    Execution of the project sections:
    The construction of metal (KM)
    Construction of metal particles (CMD)
    Architectural solutions (AR)
    Construction of Iron Beton (KJ)
    Visualization and animation of architecture;
    -Digitalization and installation of schemes and scratches.


    #5ENGINEERS #CMD #CM #Production #Construction #Development_Design #Production #Top #Freelancehunt #Freelancer
    #visualisation #visualization #Rendering #3d-visualization #metalloconstructions
    The Crossing


  • 31 USD

    Division of KMD. The spatial column.

    Engineering
    Dmitry Dmitry Anatolyovich
    Engineer of Constructor.
    Execution of the project sections:
    The construction of metal (KM)
    Construction of metal particles (CMD)
    Architectural solutions (AR)
    Construction of Iron Beton (KJ)
    Visualization and animation of architecture;
    -Digitalization and installation of schemes and scratches.


    #5ENGINEERS #CMD #CM #Production #Construction #Development_Design #Production #Top #Freelancehunt #Freelancer
    #visualisation #visualization #Rendering #3d-visualization #metalloconstructions
    The Crossing


  • Division Game

    Text editing and proofreading


  • Division of wall tissue

    Copywriting